Menu

Rail Loading Control Room Case Study

24-06-2015

Rail Loading Control Room for the joint venture between Associated British Ports and the power generation industry, providing terminal investment at the King George Dock – Hull, where a new biomass handling facility is currently under construction. ***Scope of Works***: - To design, manufacture and deliver the required control room, this being of approximate overall sizes 3.7m long x 2.9m wide x 2.7m high. ***Customer Statement***: "We at Spencer’s would like to thank Acoustic Applications for their hard work during this project, not only have you supplied a first class piece of equipment but you have endeavoured to bring the project forward to meet time restraints imposed on site. The quality of the control room is second to none and the project staff were more than accommodating to any requests and variations. We look forward to working with you again on similar projects in the future."

Visit the Acoustic Applications website for more information on Rail Loading Control Room Case Study

ENQUIRY FORM

More News

  • Acoustic Enclosure for Needle Loom Machine

  • Acoustic Enclosures for Plasma Cutting Machines

  • Replacement Acoustic Doors & Integral Holding Frames

  • Acoustic Enclosure for PSA Unit