Slinkies
Our Slinkies are manufactured from 32mm MDPE (PE80) SDR11. They are pre-coiled so you the installer simply has to cut away the correct (coloured) cable ties and they will unravel into the trench. – Saving you time and money. We produce slinkies in the following lengths 30m (200m of 32mm) - i.e. requires a 30m trench 40m (250m of 32mm) 50m (300m of 32mm) All lengths have 25m of header pipe and 55m, 65m and 75m of return pipe respectively.Visit the Go Geothermal Ltd website for more information on Slinkies