Menu

Effluent tank helps hospital meet standards

01-11-2016

A Sealwall Tank manufactured by Whites Concrete has become part of Rampton Hospital’s new Energy Centre in Nottinghamshire, U.K., which is operated and maintained under a Carbon Energy Fund framework contract. Part of the new Energy Centre that provides heating, hot water and electricity to the Nottinghamshire Healthcare NHS Trust Hospital, Whites Concrete’s pre-cast concrete Sealwall Tank is a component of Rampton’s new effluent treatment plant—now a modern, automated system that meets both current environmental standards and future expansion of the site. Designed to ensure a watertight and robust connection between adjacent panels, the Sealwall is cast in segments with a jointing system. Units undergo quality control during manufacture and also reduce build-time by up to 50%. The hospital’s existing coal-fired boilers at have been replaced with a 1 MW biomass boiler, a 1.2 MW combined heat and power (CHP) engine and three high-efficiency dual-fuel boilers running predominantly on gas. A new building management system also has been installed. Under its framework contract, guaranteed specified carbon and energy savings are set to deliver projected financial savings of around £112,000 pa for the Trust. The new plant meets all of the hospital’s heating and hot water requirements and approximately 87% of the total electricity demand, reducing CO2 emissions by around 8,000 tonnes pa.

Visit the Naylor Industries website for more information on Effluent tank helps hospital meet standards

ENQUIRY FORM

More News

  • PRODUCTS FOR MINING AND TUNNELLING PROJECTS

  • NAYLOR NEWSBEAT 2023

  • BESPOKE PLASTIC TUBES AND PROFILES

  • IF IT'S TUBULAR, WE CAN MAKE IT!