Bull Nose Repairs
The design theory was to try and create a substantial base to transmit the load from the vessels straight into the CBM construction of the quay. The works were detailed so that the works could be performed above water level without the demand for divers.Visit the A Torn Construction Ltd website for more information on Bull Nose Repairs