Case Study: Marsh Road, Burnham on Crouch, Essex
13-08-2014
The building work Marsh rd has now been completed and the house has been handed over to the clients who are very happy with the end result
The the property is a large 3 bed house with en-suite & family bathroom upstairs.
The ground floor consists of a utility room, WC/ shower room, large kitchen dinner summer room, lounge & study/gym.
This is supplied by a ground source heat pump system which supplies all the heating and hot water throughout the house at mains pressure, the large vaulted hall leads to the first floor via a bespoke made solid oak staircase which leads onto the gallery landing
Building work involved:
- Demolition of existing bungalow
- Remove under-pinning
- New piled foundations
- Suspended ground floor brick and block work
- Hollow concrete plank first floor
- Attic trussed roof
- Slate roof
- Ground source heating for under floor heating throughout
- Electrical work
- Plastering
- Install three bathrooms
- Utility room
- Fitted kitchen
- Bespoke hardwood sash windows
- Tiled floors
- Block-paved driveway
- Patio areaVisit the DT Contracting Ltd website for more information on Case Study: Marsh Road, Burnham on Crouch, Essex