How can I achieve a fast-track installation with my new self-build project?

Fast track installations can be readily achieved using a range of special products. These include ‘rapid drying formulae screeds’ and levelling compounds which dry to below 75% eRH within 24 hrs, surface epoxy liquid damp proof membranes, moisture suppressant primers, as well as underlays incorporating moisture vapour barriers. Buildings must be weather tight and ambient humidity maintained in the range of 35-65% during acclimatisation.